Extra lange Landfill Simulator H06 was set-up in 2006, and has been operating for 3 years now. The simulator was built with a total cost of 100 million Yen (Including the building). The budget was provided by Ministry of Japan (50%) and Fukuoka University (50%).
Tuesday, December 8, 2009
Prof Matsufuji Laboratory - Lysimeter
Extra lange Landfill Simulator H06 was set-up in 2006, and has been operating for 3 years now. The simulator was built with a total cost of 100 million Yen (Including the building). The budget was provided by Ministry of Japan (50%) and Fukuoka University (50%).
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment