Monday, November 5, 2012

Risk Based Corrective Action (RBCA) Tool Kit for Chemical Releases

I have purchased a new software called RBCA Tool Kit for Chemical Releaases v2.6 from GSI International Inc (http://www.gsi-net.com).  The software was designed by GSI  to meet the requirements of the ASTM Standard Guide for Risk-Based Corrective Action (E-2081).  This software provides expanded flexibility and additional risk and transport models to allow for even easier application of this essential software tool to develop risk-based soil and groundwater clean-up levels consistent with local regulations or requirements around the world.

A snapshot of the RBCA Software

Main screen of the software with an option to do Tier 1, Tier 2 and Tier 3 analysis.

Sunday, November 4, 2012

GERG Blog Statistics

Thanks to all visitors who have visited my GERG Blog.  Below is the statistics of the page views according to countries.  Thank you for your support!.


Testing mobile blog update on my Samsung Android phone.

YES, It works!!. This is a blog update using my Samsung Android phone. 

Environmental Site Assessment (ESA) - Phase II

Environmental Site Assessment (Phase II) has been conducted to determine the risk of oil contaminated site to human health and the environment.  Detail and intrusive investigations involved drilling, constructing monitoring wells, sampling of environmetal media impacted and conducting a Tier 1 risk assessment.
Drilling and constructing the monitoring well on site.
My internship student, Mr. Shohta Kihara helping with environmental media soil and groundwater sampling
Closer look at the oil contaminated soil


Groundwater Modeling of Krubung Landfill Site in Melaka

Groundwater flow and contaminant transport modeling has been conducted very recently at Kerubung Landfill site in Melaka.  The simulation of groundwater flow and transport was conducted using Visual Modflow Pro software.  The model was simulated at 5, 10 and 20 years after the released of leachate from this landfill. 

Google map of Krubung Landfill which is sited very close to Sg. Melaka
3-D view of the Krubung Landfill model area using Visual Modflow Pro Software

Model of flow and transport of contaminant from the landfill after 10-year simulation time

Virtual Fieldwork for Geologist

This project is about a virtual fieldwork.  The main objective of the project is to develop a new virtual fieldwork software for geology student in Universiti Kebangsaan Malaysia. This project is funded by Universiti Kebangsaan Malaysia under its "Pelan Tindakan Strategik" research grant.  The project will be conducted with my new MSc Student, Abang Casfian. 

The title of Virtual Fieldwork Project

Monday, October 1, 2012

Groundwater Modelling on a slope failure at Jalan Puteri 9/2, Bandar Puteri Puchong



The site is located at Bandar Puteri 9, Puchong in Selangor.  The site is surrounded by a hilly terrain on the east and south of the area.  There is also a small stream located on the north side of the site, flowing east-west.  The site was excavated for a housing development and was levelled by cut and fill method.  The south part (hill) was cut and the cut material was used to fill up the valley up to a platform level.  During the filling process, the natural drainage pattern was also filled, resulting blockage of the existing river and later may influence the groundwater flow pattern in this area.
The project site at Jalan Puteri 9/2 in Puchong Selangor

Groundwater flowing so fast from these horizontal drains.  Looks like there is underground river below this site